Short Lead Time for Four Parts Mixing Valve - Floor heating mixed water center system – Xinfan
Short Lead Time for Four Parts Mixing Valve - Floor heating mixed water center system – Xinfan Detail:
Product Details
Warranty: | 2 Years | Number: | XF15177S,XF15177A |
After-sale Service: | Online technical support | Type: | Floor Heating Systems |
Style: | Modern | Keywords: | Pump group,Mixing unit |
Brand Name: | SUNFLY | Color: | Raw surface |
Application: | Apartment | Size: | 1 1/2” |
Name: | Floor heating mixed water center system | MOQ: | 5 sets |
Place of Origin: | Zhejiang, China | ||
Brass Project Solution Capability: | Graphic design, 3D model design, total solution for Projects, Cross Categories Consolidation |
Product parameters
Specifications Secondary system interface: 1 ”F System interface: 1 ”m |
Product material
Brass Hpb57-3(Accepting other copper materials with customer-specified, such as Hpb58-2,Hpb59-1,CW617N,CW603N and so on)
Processing Steps
Raw Material, Forging,Roughcast,Slinging, CNC Machining,Inspection,Leaking Test, Assembly,Warehouse,Shipping
Material Testing, Raw Material Warehouse, Put In Material, Self-Inspection, First Inspection, Circle Inspection, Forging, Annealing, Self-Inspection, First Inspection, Circle Inspection, Machining, Self-Inspection, First Inspection, Circle Inspection, Finished Inspection, Semi-Finished Warehouse, Assembling, First Inspection, Circle Inspection, 100% Seal Testing, Final Random Inspection, Finished Product Warehouse, Delivering
Applications
Hot or cold water,heating system,mix water system,Construction materials etc.
Main Export Markets
Europe,East-Europe,Russia,Middle-Asia,North America,South America and so on.
Product Description
The floor heating water mixing center can protect the boiler and prolong the service life of the boiler. People have always thought that only central heating needs to be equipped with a mixed water heat exchange center, but they have neglected that wall-hung boilers and other floor-standing boilers should also be equipped with a mixed water center. The low-temperature operation of the boiler will cause frequent start-ups and backflow of condensed water into the furnace, which will shorten the life of the boiler and increase energy consumption. Therefore, the optimized floor heating system needs to be equipped with a water mixing center. The floor heating water mixing center can protect the boiler and prolong the service life of the boiler. People have always thought that only central heating needs to be equipped with a mixed water heat exchange center, but they have neglected that wall-hung boilers and other floor-standing boilers should also be equipped with a mixed water center. The low-temperature operation of the boiler will cause frequent start-ups and backflow of condensed water into the furnace, which will shorten the life of the boiler and increase energy consumption. Therefore, the optimized floor heating system needs to be equipped with a water mixing center. The floor heating mixed water center can protect the floor heating pipes and prevent the ground from cracking. The radiator heating requires high temperature water, while the floor heating requires low temperature water. The installation of a water mixing center can easily achieve the requirement of one boiler to provide two heating water temperatures. The mixing water center has a temperature setting function, which avoids the phenomenon of excessively high room temperature and ground cracking caused by the high-temperature water supply of the floor heating, and extends the service life of the floor heating pipeline system. When the domestic heating supply is too high and exceeds the normal operating temperature of the pipeline, the service life of the pipeline will be greatly reduced. The floor heating mixed water center can improve the energy efficiency of the boiler and save the gas usage fee. The efficiency of the boiler at rated power is generally 93-94%, and the efficiency under low load is generally below 90%. After the water mixing center is configured, the boiler can be operated under high-efficiency working conditions, thereby saving gas usage costs. The floor heating mixed water center can truly realize sub-room control, ensuring that each area can be opened separately to provide a comfortable heating temperature. Because the operation of the boiler is started and stopped by detecting the temperature difference between the supply and return water, when the other heating areas are out of service at night and only one bedroom is used for heating, the heating pipeline is relatively short and the water supply and return speed is fast, resulting in frequent start and stop of the boiler. The heating requirements are not met, and the gas is wasted in vain. The floor heating mixed water center increases the flow rate of heating water and improves the heat exchange effect. There is a circulating water pump in the mixed water center configuration. Its additional function is to increase the flow rate of the heating water and increase the heat exchange rate, thereby accelerating the heating time of the floor heating and saving gas.
Product detail pictures:
Related Product Guide:
"Sincerity, Innovation, Rigorousness, and Efficiency" is the persistent conception of our company for the long-term to develop together with customers for mutual reciprocity and mutual benefit for Short Lead Time for Four Parts Mixing Valve - Floor heating mixed water center system – Xinfan , The product will supply to all over the world, such as: Greece, Pretoria, Zimbabwe, Each year, many of our customers would visit our company and achieve great business advancements working with us. We sincerely welcome you to visit us at any time and together we will prevail to a greater success in the hair industry.
By Roberta from El Salvador - 2017.05.02 11:33
We have been appreciated the Chinese manufacturing, this time also did not let us disappoint,good job!
By Meroy from Cannes - 2018.06.26 19:27